Faster chat, better deals — Get the App

Senior Consultant, Project Execution Plan - 7077

MyJob

Company

Job typeFull-time
Workplace typeOnsite
Experience levelNo experience limit
Education levelNo degree limit

Description

Job Summary: We are seeking a Senior Project Consultant with experience in mining or petrochemicals to support an important tender process. Key Highlights: 1. 50 years of experience in Engineering and Projects 2. High level of specialization in mining or petrochemicals 3. Proficiency in various methodologies and best practices R\&Q Engineering, an Engineering and Projects company with 50 years of experience, is seeking a **Senior Consultant, Project Execution Plan**, for the **Metropolitan Region**, for an important tender process in the mining sector: **Estimated duration of the tendered contract: 36 months.** **Requirements:** Civil or Industrial Engineer, graduated, in any specialty (degree certificate notarized), with 15–20 years of specific experience in their specialty, possessing solid knowledge and mastery of the discipline, with a high degree of specialization in their field of practice, in accordance with the best practices of the mining or petrochemical industry. Other requirements: * A postgraduate degree, certification, and/or research and publication experience in their specialty is desirable for services requiring a high level of technical specialization. * Knowledge and proficiency in: Methodologies and best practices within their specialty: PMO Management, Project Management, Organizational Change Design and Implementation, Engineering, Construction Administration, Commissioning, Maintainability and Reliability, Lean and Productivity, Planning, Scheduling and Control, Cost Estimation, Cost Control, Economic Evaluation, Risk Management, Quality Assurance and Control, Occupational Health and Safety, Environment, Technology and Information Systems, Procurement and Contract Administration, Compensation and Claims Management, Sustainability and External Resources, Project Formulation. **Important:** All listed requirements are mandatory and must be fully met to be considered for this process. Hiring will be subject to the conditions of the corresponding tender process. **Desired Profile** ------------------ Civil or Industrial Engineer, graduated, in any specialty (degree certificate notarized), with 15–20 years of specific experience in their specialty, possessing solid knowledge and mastery of the discipline, with a high degree of specialization in their field of practice, in accordance with the best practices of the mining or petrochemical industry. Other requirements: * A postgraduate degree, certification, and/or research and publication experience in their specialty is desirable for services requiring a high level of technical specialization. * Knowledge and proficiency in: Methodologies and best practices within their specialty: PMO Management, Project Management, Organizational Change Design and Implementation, Engineering, Construction Administration, Commissioning, Maintainability and Reliability, Lean and Productivity, Planning, Scheduling and Control, Cost Estimation, Cost Control, Economic Evaluation, Risk Management

Some content was automatically translated

Posted by

Sofía Muñoz

MyJob · HR

Location

Sofía Muñoz

MyJob · HR

Similar jobs

Senior Consultant, Project Execution Plan - 7077 job by MyJob in 2026 | ok.com