Description
Position Summary:
A construction company is seeking a Technical Office Manager for a building renovation project, with experience in administration and supervision.
Key Highlights:
1. Leadership role in the technical office
2. Teamwork coordination
3. Expert use of Microsoft Project
**Technical Office Manager and Construction Scheduler**
**Valparaíso**
**Microsoft Project Expert**
A construction company seeks a Technical Office Manager for an office building renovation project located in downtown Valparaíso.
**Requirements:**
* Professional in the construction field: Civil Constructor or Construction Engineer
* Proven experience as a Technical Office Administrator and/or field supervisor on building projects, including at least 4,000 m² of constructed area in new or extension building works. *Excluded: a) Single-family residential buildings or housing complexes, except those with five or more floors; b) Industrial or assembly works; and c) Civil engineering works.*
* Residence in the Valparaíso Region.
* Mandatory requirements: proficiency in AutoCAD, Microsoft Project, intermediate-level Excel, and PAC.
* **Expert use of Microsoft Project** (verifiable advanced level). A fundamental requirement.
* Budget management, quantity take-offs, payment certifications, change orders, RDI (Inspection and Defect Report), and teamwork coordination.
**Mandatory Documentation:**
* Professional degree certificate.
* Employer certificates verifying experience in building projects (one per executed project).
**Interested candidates should send their CV, supporting documents, and salary expectations to:**
obrascivilesvalpo@gmail.com
**Subject:** *Technical Office Manager and Construction Scheduler – Valparaíso*
Salary: $927.096 – $2,267,379 per month
Workplace: On-site employment