




Job Summary: We are seeking Electrical Engineers/Technicians specialized in testing and commissioning of transmission electrical substations. Key Highlights: 1. Support during commissioning for testing and troubleshooting. 2. Pre-commissioning of Control and Protection Schemes. 3. Commissioning of electrical substations (GIS). Objective Tasks Simultaneous support/execution of testing and troubleshooting during commissioning of LCCs carried out by GE\-PT. Pre\-commissioning of Control and Protection Schemes with support from personnel provided by Serviland. Support for testing and troubleshooting during commissioning of Control and Protection Schemes carried out by GE\-GA. Pre\-commissioning of Control and Protection Schemes for specific tasks: long ATR2 protection, SSAA controller, ATR2 regulator, others. Support for testing and troubleshooting during commissioning of specific tasks performed by GE subcontractor specialists. Commissioning of the Cerro Navia 110kV Substation (GIS). Support for Level 3 and 4 testing\. Requirements and Initial Contractual Forecast **Personnel:** Electrical Engineers/Technicians. **Duration:** 6 months. Extendable based on performance and company needs. **Start Date:** 22/06/2026 or ASAP. **Generic Profile:** Specialist in testing and commissioning of transmission electrical substations. **Education Level:** Engineer / University Senior Technician. **Minimum Experience:** 4 to 6 years of demonstrable experience in recent transmission electrical substation projects (110kV or higher). \-Requirements\- Minimum Education: Secondary Education C.H. / Technical Education. 2 years of experience. Keywords: technologist, technician, tech, technician, technology, tecnología, technologist, electrician, lineman, electricista. Objective Tasks Simultaneous support/execution of testing and troubleshooting during commissioning of LCCs carried out by GE\-PT. Pre\-commissioning of Control and Protection Schemes with support from personnel provided by Serviland. Support for testing and troubleshooting during commissioning of Control and Protection Schemes carried out by GE\-GA. Pre\-commissioning of Control and Protection Schemes for specific tasks: long ATR2 protection, SSAA controller, ATR2 regulator, others. Support for testing and troubleshooting during commissioning of specific tasks performed by GE subcontractor specialists. Commissioning of the Cerro Navia 110kV Substation (GIS). Support for Level 3 and 4 testing\. Requirements and Initial Contractual Forecast **Personnel:** Electrical Engineers/Technicians. **Duration:** 6 months. Extendable based on performance and company needs. **Start Date:** 22/06/2026 or ASAP. **Generic Profile:** Specialist in testing and commissioning of transmission electrical substations. **Education Level:** Engineer / University Senior Technician. **Minimum Experience:** 4 to 6 years of demonstrable experience in recent transmission electrical substation projects (110kV or higher). \-Requirements\- Minimum Education: Secondary Education C.H. / Technical Education. 2 years of experience. Keywords: technologist, technician, tech, technician, technology, tecnología, technologist, electrician, lineman, electricista **Salary:** 0 CLP/MONTH.


